Hi,
I would like to be able to register the quantity and lot number of the product being produced at the end of the production and not at the beginning.
Currently, we have 3 operations for one of our process:
MO
|----- Operation 1 (Currently where production is registered)
|----- Operation 2
|----- Operation 3 (Where I would like the operator to register the qty produced)
I'm able to add a "Register Quantity" instruction on the 3rd operation, but it doesn't seem linked to the MO planned quantity. Furthermore, I do not see the option to remove the "Register Quantity" instruction from the first operation.